Tired 1990s family bathroom replaced with grey porcelain tiles, walk-in shower and freestanding bath in 3 weeks.
Stripped, tanked, plumbed, tiled, fitted and finished by one team — level-access showers, continental tile detail, and a written workmanship guarantee on the whole install.
Tanked to BS 5385 · Single team · 2–4 weeks on site
A bathroom either lasts 15 years or it leaks within 18 months — and the difference is almost entirely under the tile, not on top of it. We see the failures regularly because we get called in to strip them out and rebuild.
Our bathroom service covers full strip-out and rebuild — old suite removed, walls re-boarded with marine ply or cement board where needed, full tanking to BS 5385 wet area standards, plumbing first-fix and electrical first-fix relocated as needed, underfloor heating where specified, large-format porcelain tiling, sanitaryware install, glazing (shower screens, walk-in shower glass), tap and shower system second-fix, and decoration. Family bathrooms, ensuites, wet rooms and downstairs WCs.
Most clients are owner-occupiers refurbishing tired 1980s/1990s bathrooms in Victorian and Edwardian period stock, families upgrading after a loft conversion has added an ensuite requirement, and landlords specifying durable mid-range bathrooms for premium lets. Typical site duration is 2–3 weeks for a family bathroom, 3–4 weeks for a wet room with full tanking and underfloor heating.
Part of our interior fit-out & refurbishment work across East London.

Bathroom failures are predictable and expensive. The common ones are all under the tile, invisible until water finds the kitchen ceiling below:
Insurance will cover sudden burst pipes; it usually won't cover gradual leaks attributed to defective workmanship.
Five stages, run by a single team end-to-end. No subcontracted tiler arriving a week late and re-doing the silicone in a hurry.
Measure-up, layout discussion, suite and tile selection guidance. We confirm what fits, drain positions, floor build-up implications.
Itemised — suite, tiles, tanking, plumbing, electrics, underfloor heating, decoration. You see exactly what every line costs.
Old suite removed, walls re-boarded with appropriate substrate, plumbing and electrical first-fix relocated, soil and waste pipework adjusted, UFH laid if specified.
Substrate primed, tanking applied (slurry coat or membrane), drain gulleys and falls formed, large-format porcelain tiled, grouted, silicone-jointed.
Suite installed, shower screens fitted, taps and shower commissioned, pressure-tested, snag walk-through, written workmanship guarantee.
Full slurry-coat or membrane tanking applied to the wet zone (shower) and the entire bathroom floor — the substrate stays dry even if the surface joints fatigue.
Marine ply or cement board in wet zones, moisture-resistant plasterboard elsewhere. Standard plasterboard never goes within 1m of a shower or bath.
Wet room and walk-in shower floors set with proper falls to the gulley before tiling — water clears the floor instead of pooling on it.
Plumber, tiler and decorator all from one company. No 'wait for the tiler to come back' weeks. One snag list, one warranty, one number.
Tanking is the waterproofing layer applied to the substrate before tiling. There are two main system types: slurry coats (cementitious or polymer-modified slurry painted onto the substrate, typically two coats with a reinforcing fabric at corners and joints) and sheet membranes (foam-cored or polyethylene sheet bonded to the substrate, popular for full wet rooms and underfloor heating zones). For BS 5385 wet area compliance the entire shower zone and the bathroom floor must be tanked; for full wet rooms the entire room is tanked.
Substrate choice underneath the tanking is critical. In wet zones (shower walls, the splash zone behind a bath), we use either marine ply or cement-fibre board (Hardiebacker, NoMorePly). Standard plasterboard — even moisture-resistant 'green' board — is not appropriate for wet zones because it loses structural strength when repeatedly wetted. For dry zones in the same bathroom, moisture-resistant plasterboard is acceptable.
Drain gulley installation determines whether a wet room or walk-in shower works for 15 years or starts pooling within two. The gulley must be set at the lowest point with a minimum 1:80 fall (12.5mm per metre) across the floor toward it. The substrate is built up around the gulley with screed or fall-formers, then tanked, then tiled with adhesive thick enough to bed each tile to the fall without lippage. Cutting tiles to follow a curved fall is the slow part of a wet room install.
Tile adhesive must match the tile and the substrate. Large-format porcelain (anything over 600×600) needs a flexible C2S1 or C2S2 adhesive, applied with a proper 10mm or 12mm notched trowel and back-buttered onto the tile to achieve >95% coverage. Skim-coverage installs (where adhesive doesn't reach the back of the tile) are the single biggest cause of debonding within 18–24 months.
Silicone joints are the last waterproofing line. They go between dissimilar materials (tile to bath, tile to shower tray, tile to wall corners) and they fatigue with movement. Industry-standard sanitary-grade silicone (with anti-mould additive) lasts 5–8 years before needing replacement; cheap general-purpose silicone fails within 18 months. We use Mapei Mapesil AC or equivalent on every bathroom.
Bathroom installs are our highest-frequency interior project. Most weekly schedules include 1–2 bathrooms across South Woodford, Wanstead, Walthamstow, Buckhurst Hill and Loughton, with regular work in Hackney, Stratford, Chingford, Ilford and Romford.
Don't see your postcode? See every area we cover or ask us directly.
Founder & Lead Contractor, RJS Innovative Building Ltd
9+ years on East London building & fit-out projects · Companies House #10012712
Raphael personally specifies the tanking system, substrate and adhesive for every bathroom we install. The standard he set in 2017 — cement board in wet zones, slurry tanking across the full floor, C2S2 adhesive on every porcelain install over 600mm — has produced more than 180 bathrooms with zero waterproofing call-backs.
Real East London projects — photographed on completion. Captions describe the actual work delivered.
Tired 1990s family bathroom replaced with grey porcelain tiles, walk-in shower and freestanding bath in 3 weeks.
Loft conversion ensuite with level-access shower, full tanking and underfloor heating, completed in 2.5 weeks.
Bathroom converted to full wet room with frameless glass screen, large-format porcelain and digital shower system.
Free site visit, fixed written quote, full tanking included as standard. Let's spec it properly.
Tanked to BS 5385 · Single team · 2–4 weeks on site