RJS Innovative Building Ltd logo
    07783 449 736Get a Free Quote
    Bathroom Fitting & Refurbishment

    Bathroom Fitting & Refurbishment in South Woodford & East London — full rebuilds, properly tanked

    Stripped, tanked, plumbed, tiled, fitted and finished by one team — level-access showers, continental tile detail, and a written workmanship guarantee on the whole install.

    Get a Free Quote 07783 449 736

    Tanked to BS 5385 · Single team · 2–4 weeks on site

    • Bathrooms refurbished180+ across East London
    • Typical site duration2–4 weeks
    • Tanking standardBS 5385 wet area compliant
    • Workmanship guaranteeWritten, contract-specific
    What this service covers

    Bathroom Fitting & Refurbishment — what we deliver

    A bathroom either lasts 15 years or it leaks within 18 months — and the difference is almost entirely under the tile, not on top of it. We see the failures regularly because we get called in to strip them out and rebuild.

    Our bathroom service covers full strip-out and rebuild — old suite removed, walls re-boarded with marine ply or cement board where needed, full tanking to BS 5385 wet area standards, plumbing first-fix and electrical first-fix relocated as needed, underfloor heating where specified, large-format porcelain tiling, sanitaryware install, glazing (shower screens, walk-in shower glass), tap and shower system second-fix, and decoration. Family bathrooms, ensuites, wet rooms and downstairs WCs.

    Most clients are owner-occupiers refurbishing tired 1980s/1990s bathrooms in Victorian and Edwardian period stock, families upgrading after a loft conversion has added an ensuite requirement, and landlords specifying durable mid-range bathrooms for premium lets. Typical site duration is 2–3 weeks for a family bathroom, 3–4 weeks for a wet room with full tanking and underfloor heating.

    Part of our interior fit-out & refurbishment work across East London.

    Modern grey-tile bathroom with wall-hung vanity, anthracite towel rail and contemporary WC — bathroom fitting by RJS Innovative Building, East London
    What goes wrong

    Where bathroom fitting & refurbishment projects typically fail

    Bathroom failures are predictable and expensive. The common ones are all under the tile, invisible until water finds the kitchen ceiling below:

    • Standard plasterboard used in wet zones instead of marine ply, cement board or moisture-resistant board — substrate fails, tiles drop, water finds the joists.
    • Tanking skipped or applied only to the shower zone — water tracks under the tile from the floor, soaks the substrate over months, eventually drips through.
    • Drain falls cut wrong — water pools, silicone joints fatigue, waterproofing is breached at the very point that's wettest.
    • Tile adhesive specified for a different substrate (standard adhesive on porcelain — needs flexible C2S2) — tiles debond within 12–18 months.
    • Silicone joints applied over wet substrate or dirty surfaces — silicone fails to bond, peels within months, water gets behind.

    Insurance will cover sudden burst pipes; it usually won't cover gradual leaks attributed to defective workmanship.

    How it works

    Our bathroom fitting & refurbishment process — five stages

    Five stages, run by a single team end-to-end. No subcontracted tiler arriving a week late and re-doing the silicone in a hurry.

    1. 01

      Free site visit & spec

      Measure-up, layout discussion, suite and tile selection guidance. We confirm what fits, drain positions, floor build-up implications.

    2. 02

      Fixed written quote

      Itemised — suite, tiles, tanking, plumbing, electrics, underfloor heating, decoration. You see exactly what every line costs.

    3. 03

      Strip-out & first-fix

      Old suite removed, walls re-boarded with appropriate substrate, plumbing and electrical first-fix relocated, soil and waste pipework adjusted, UFH laid if specified.

    4. 04

      Tanking & tiling

      Substrate primed, tanking applied (slurry coat or membrane), drain gulleys and falls formed, large-format porcelain tiled, grouted, silicone-jointed.

    5. 05

      Sanitary install & handover

      Suite installed, shower screens fitted, taps and shower commissioned, pressure-tested, snag walk-through, written workmanship guarantee.

    Why it pays off

    What you get from doing this properly

    Tanked to BS 5385 wet area standard

    Full slurry-coat or membrane tanking applied to the wet zone (shower) and the entire bathroom floor — the substrate stays dry even if the surface joints fatigue.

    Correct substrate every time

    Marine ply or cement board in wet zones, moisture-resistant plasterboard elsewhere. Standard plasterboard never goes within 1m of a shower or bath.

    Drain falls cut to 1:80 minimum

    Wet room and walk-in shower floors set with proper falls to the gulley before tiling — water clears the floor instead of pooling on it.

    Single accountable team

    Plumber, tiler and decorator all from one company. No 'wait for the tiler to come back' weeks. One snag list, one warranty, one number.

    Materials, methods, variations

    Tanking systems, substrate choice, and what makes a bathroom last 15+ years

    Tanking is the waterproofing layer applied to the substrate before tiling. There are two main system types: slurry coats (cementitious or polymer-modified slurry painted onto the substrate, typically two coats with a reinforcing fabric at corners and joints) and sheet membranes (foam-cored or polyethylene sheet bonded to the substrate, popular for full wet rooms and underfloor heating zones). For BS 5385 wet area compliance the entire shower zone and the bathroom floor must be tanked; for full wet rooms the entire room is tanked.

    Substrate choice underneath the tanking is critical. In wet zones (shower walls, the splash zone behind a bath), we use either marine ply or cement-fibre board (Hardiebacker, NoMorePly). Standard plasterboard — even moisture-resistant 'green' board — is not appropriate for wet zones because it loses structural strength when repeatedly wetted. For dry zones in the same bathroom, moisture-resistant plasterboard is acceptable.

    Drain gulley installation determines whether a wet room or walk-in shower works for 15 years or starts pooling within two. The gulley must be set at the lowest point with a minimum 1:80 fall (12.5mm per metre) across the floor toward it. The substrate is built up around the gulley with screed or fall-formers, then tanked, then tiled with adhesive thick enough to bed each tile to the fall without lippage. Cutting tiles to follow a curved fall is the slow part of a wet room install.

    Tile adhesive must match the tile and the substrate. Large-format porcelain (anything over 600×600) needs a flexible C2S1 or C2S2 adhesive, applied with a proper 10mm or 12mm notched trowel and back-buttered onto the tile to achieve >95% coverage. Skim-coverage installs (where adhesive doesn't reach the back of the tile) are the single biggest cause of debonding within 18–24 months.

    Silicone joints are the last waterproofing line. They go between dissimilar materials (tile to bath, tile to shower tray, tile to wall corners) and they fatigue with movement. Industry-standard sanitary-grade silicone (with anti-mould additive) lasts 5–8 years before needing replacement; cheap general-purpose silicone fails within 18 months. We use Mapei Mapesil AC or equivalent on every bathroom.

    Compact ensuite shower room with quadrant enclosure, oak vanity and counter-top vessel basin — bathroom fitting by RJS Innovative Building, East London
    Bathroom floor and lower walls tanked with cementitious slurry waterproofing on a wet room install in Wanstead — drain gulley set with 1:80 fall before porcelain tiling.
    Where we deliver this work

    Areas we cover for bathroom fitting & refurbishment

    Bathroom installs are our highest-frequency interior project. Most weekly schedules include 1–2 bathrooms across South Woodford, Wanstead, Walthamstow, Buckhurst Hill and Loughton, with regular work in Hackney, Stratford, Chingford, Ilford and Romford.

    Don't see your postcode? See every area we cover or ask us directly.

    RSRaphael SappaFounder · Lead ContractorEst. 2016
    Who delivers this service

    Raphael Sappa

    Founder & Lead Contractor, RJS Innovative Building Ltd

    9+ years on East London building & fit-out projects · Companies House #10012712

    Raphael personally specifies the tanking system, substrate and adhesive for every bathroom we install. The standard he set in 2017 — cement board in wet zones, slurry tanking across the full floor, C2S2 adhesive on every porcelain install over 600mm — has produced more than 180 bathrooms with zero waterproofing call-backs.

    Recent work

    Recent bathroom fitting & refurbishment projects

    Real East London projects — photographed on completion. Captions describe the actual work delivered.

    Bathroom Fitting & Refurbishment in South Woodford, E18 — Modern grey-tile bathroom with wall-hung vanity, anthracite towel rail and contemporary WC — bathroom fitting by RJS Innovative Building, East London

    South Woodford, E18

    Tired 1990s family bathroom replaced with grey porcelain tiles, walk-in shower and freestanding bath in 3 weeks.

    Bathroom Fitting & Refurbishment in Wanstead, E11 — Skylit family bathroom with large-format porcelain tiling and walk-in shower enclosure — bathroom fitting by RJS Innovative Building, East London

    Wanstead, E11

    Loft conversion ensuite with level-access shower, full tanking and underfloor heating, completed in 2.5 weeks.

    Bathroom Fitting & Refurbishment in Walthamstow, E17 — Wall-hung bathroom vanity with rectangular basin and chrome mixer on porcelain tiling — bathroom fitting by RJS Innovative Building, East London

    Walthamstow, E17

    Bathroom converted to full wet room with frameless glass screen, large-format porcelain and digital shower system.

    FAQ

    Bathroom Fitting & Refurbishment — frequently asked questions

    Get started

    Planning a bathroom rebuild, ensuite or full wet room?

    Free site visit, fixed written quote, full tanking included as standard. Let's spec it properly.

    Request Your Free Quote Call 07783 449 736

    Tanked to BS 5385 · Single team · 2–4 weeks on site

    Related services

    Accreditation

    Find us

    RJS Innovative Building Ltd

    47 Pulteney Road, South Woodford, London E18 1PR

    Co. #10012712 · Founded 2016

    Page details

    Last updated: April 2026

    Author: Raphael Sappa

    Call Free Quote